Basic Surveying (3rd Sem) Previous Year Solved Question Paper
1. Basic Surveying. 2019 previous year solved MCQs
( download pdf 👈)
a. 16
c. Geodetic survey
b. Negative
c. Setting out right angle
c. Proof line
a. Steel & Nickle
b. Prismatic Compass
a. Contour interval
d. 210°
b. 100°
d. 50°
c. Both a &b
a. Pond
d. Contour line
b. Cumulative positive
d. 0.07857 m
a. Vertical plane
a. Target staff
c. 10000 m²
b. Planimeter
2. Basic Surveying 2020 previous year solved MCQs
( download pdf 👈)
a. Triangle
a. Steel & Nickle
d. All of these
c. 100
b. Chaining
c. Proof line
b. S 60° W
b. Inverted
a. 225°
a. Whole circle bearing system
b. Prismatic compass
d. All of these
d. All of these
d. 05 mm
a. Subtractive
b. Hill
a. Contour interval
b. 4840 square yard
a. Planimeter
b. Plane surveying
3. Basic Surveying 2021(Regular) previous year solved MCQs
( download pdf 👈)
c. Geodetic survey
c. Invar tape
a. Pond
d. None of these
a. Vertical angle
b. Cumulative positive
c. 70°
a. 60°
a. Whole circle bearing system
b. 45°
a. Steel tape
c. Back sight
b. Level surface
c. Both a & b
d. All of these
b. Staff is placed
b. Contour line
b. Area
c. 10000 m²
a. Vertical
4. Basic Surveying 2021(Backlog) previous year solved MCQs
( download pdf 👈)
c. 100
c. Geodetic survey
a. Vertical angle
c. Both a & b
a. Negative
d. 230°
b. Building
d. S 30° W
a. Whole circle bearing system
b. Prismatic compass
a. Level surface
a. Plus sight
c. Both a & b
c. Back sight
c. Inside the telescope near the eye piece
a. Vertical
a. Planimeter
b. Contour line
b. Hill
b. 4840 square yard
5. Basic Surveying 2022(Regular) previous year solved MCQs
( download pdf 👈)
b. 66 feet
c. Both a & b
c. Geodetic survey
a. Triangle
a. Cumulative positive
b. 45°
d. 45°
d. 195°
b. Prismatic Compass
a. Inverted
c. Datum
b. Minus sight
c. Both a & b
d. All of these
b. Level surface
d. All of these
a. Contour interval
a. Pond
c. 2.471 acres
a. Area